Monday, August 14, 2006

Earthwork Underway

Driveway culvert pipe is in and the ditch has been backfilled. Placement of aggregate base and asphalt will be later - no point in accidentally tearing up asphalt during construction. Photo is looking to the south.


The building pad is being graded and is almost complete. Top of pad elevation is about 2 feet above original grade. The pad should be done within another day or two.

Here's a couple shots of the site as well. The house to the right in the second photo is my sister's place. First photo is looking to the west, the second to the northwest.