OK, lots of things going on right now, which is good! The two back patio fans and all the lights have been installed, as have the downspouts.
.

.
The two AC units have been installed as well.
.
.
All the lights have been installed in the garage. The fire sprinkler system shutoff valve and pressure gauge is in the white box on the far wall.
.
.
Central vacuum toe kick plates have been hooked up. Now we just need the cabinets. They are holding us up at the moment, unfortunately. I do need to do a lot of cleanup work this weekend to get rid of the garbage in the garage and clear out room for the cabinets to be stored and our belongings to wait for the move-in date.
.
.
And last (but certainly not least) is the hope of electricity coming soon! SMUD has marked the power pole locations and called USA (Underground Service Alert) to check for utilities in the area. After the power pole is installed the phone company will use it for their service as well.
.